EXPO

Maritime Youth House

How do you turn the problem of a polluted site into an architectural potential? A third of our budget was allocated to remove our polluted topsoil. By covering the site with a wooden deck we could leave the soil…

Rocinha

From our point of view, this concerns the articulation of aspects ranging from the physical (urban, infrastructural and environmental), social (economical, cultural and existential), ecological (considering three kinds: mental, social and environmental) and those related to citizen´s safety, and…

Punt Verd

Punt verd, within a 1.7 million euros, is the most important building integrated in the “Nuevo Plano Integral de Gestión de Residuos de Mercabarna” (Mercabarna’s New Integral Plan for Recycling Waste). The basic goal of this plan is to…

BLOG

RADAR

Una segunda vida para el caucho

Jun 01, 2011 - 09:32 AM

Medicamentos derivados del petróleo

Jun 01, 2011 - 07:42 AM

Taller de economía social en Barcelona

May 16, 2011 - 04:41 PM